夜月直播视频直播免费观看,娇妻玩4P被3个男人玩,人妻少妇AV中文字幕乱码,亚洲av永久无码精品

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.btmj.net/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

臨邊護(hù)欄防護(hù)作業(yè)操作的事項(xiàng)介紹

來(lái)源:http://www.btmj.net/   發(fā)布時(shí)間:2024-03-13

在臨邊護(hù)欄作業(yè)施工時(shí)重要的是,大于一切,但盡管三令五申強(qiáng)調(diào)作業(yè),但還是有很多企業(yè)違反規(guī)定沒(méi)有按照政策去施工,導(dǎo)致了生產(chǎn)問(wèn)題時(shí)有發(fā)生,給和社會(huì)造成很大損失。因此頒布臨邊洞口作業(yè)施工標(biāo)準(zhǔn)規(guī)范工地操作施工,這是繼91年標(biāo)準(zhǔn)后2016年新的基本規(guī)定。

When working on edge guardrails, it is important to prioritize safety. Safety is paramount. Despite the country's repeated emphasis on safe operations, many enterprises still violate regulations and fail to follow national policies, resulting in frequent safety production issues and causing significant losses to the country and society. Therefore, the country has issued construction standards for edge opening operations to regulate the safe operation and construction of construction sites, which is a new basic regulation in 2016 following the 91 year standard.

1 建筑施工中凡涉及臨邊與洞口作業(yè)、攀登與懸空作業(yè)、操作平臺(tái)、交叉作業(yè)及網(wǎng)搭設(shè)的,應(yīng)在施工組織設(shè)計(jì)或施工方案中制定高處作業(yè)技術(shù)措施。

For construction involving edge and hole operations, climbing and suspended operations, operating platforms, cross operations, and safety net installation, safety technical measures for high-altitude operations should be formulated in the construction organization design or construction plan.

2 高處作業(yè)施工前,應(yīng)按類別對(duì)防護(hù)設(shè)施進(jìn)行檢查、驗(yàn)收,驗(yàn)收合格后方可進(jìn)行作業(yè),并應(yīng)做驗(yàn)收記錄。驗(yàn)收可分層或分階段進(jìn)行。

20230315030529840.jpg

Before carrying out high-altitude operations, safety protection facilities should be inspected and accepted according to their categories. Only after passing the acceptance can operations be carried out, and acceptance records should be kept. Acceptance can be carried out in layers or stages.

3 高處作業(yè)施工前,應(yīng)對(duì)作業(yè)人員進(jìn)行技術(shù)交底,并應(yīng)記錄。應(yīng)對(duì)初次作業(yè)人員進(jìn)行培訓(xùn)。

Before carrying out high-altitude operations, safety technical briefing should be conducted to the workers and recorded. Training should be provided to first-time workers.

4 應(yīng)根據(jù)要求將各類警示標(biāo)志懸掛于施工現(xiàn)場(chǎng)各相應(yīng)部位,夜間應(yīng)設(shè)紅燈警示。高處作業(yè)施工前,應(yīng)檢查高處作業(yè)的標(biāo)志、工具、儀表、電氣設(shè)施和設(shè)備,確認(rèn)其完好后,方可進(jìn)行施工。

4. Various safety warning signs should be hung at the corresponding parts of the construction site according to requirements, and red lights should be set up for warning at night. Before carrying out high-altitude operations, safety signs, tools, instruments, electrical facilities, and equipment for high-altitude operations should be checked and confirmed to be in good condition before construction can proceed.

5 高處作業(yè)人員應(yīng)根據(jù)作業(yè)的實(shí)際情況配備相應(yīng)的高處作業(yè)防護(hù)用品,并應(yīng)按規(guī)定正確佩戴和使用相應(yīng)的防護(hù)用品、用具。

5. High altitude workers should be equipped with corresponding safety protection equipment according to the actual situation of the work, and should correctly wear and use the corresponding safety protection equipment and tools according to regulations.

6 對(duì)施工作業(yè)現(xiàn)場(chǎng)可能墜落的物料,應(yīng)及時(shí)拆除或采取固定措施。高處作業(yè)所用的物料應(yīng)堆放平穩(wěn),不得妨礙通行和裝卸。工具應(yīng)隨手放入工具袋;作業(yè)中的走道、通道板和登高用具,應(yīng)隨時(shí)清理干凈;拆卸下的物料及余料和廢料應(yīng)及時(shí)清理運(yùn)走,不得隨意放置或向下丟棄。傳遞物料時(shí)不得拋擲。

6 pairs of materials that may fall on the construction site should be promptly removed or fixed measures taken. The materials used for high-altitude operations should be stacked steadily and not obstruct passage and loading and unloading. Tools should be easily placed in a tool bag; The walkways, walkways, and high-altitude equipment used in homework should be cleaned at all times; The dismantled materials, surplus materials, and waste materials should be cleaned and transported away in a timely manner, and should not be arbitrarily placed or discarded downwards. Do not throw materials during transfer.

7 高處作業(yè)應(yīng)按現(xiàn)行標(biāo)準(zhǔn)《建設(shè)工程施工現(xiàn)場(chǎng)消防技術(shù)規(guī)范》GB 50720的規(guī)定,采取防火措施。

7. Fire prevention measures should be taken for high-altitude operations in accordance with the current national standard GB 50720 Technical Code for Fire Safety at Construction Sites.

8 在雨、霜、霧、雪等天氣進(jìn)行高處作業(yè)時(shí),應(yīng)采取防滑、防凍和防雷措施,并應(yīng)及時(shí)作業(yè)面上的水、冰、雪、霜。當(dāng)遇有6級(jí)及以上強(qiáng)風(fēng)、濃霧、沙塵暴等惡劣氣候,不得進(jìn)行露天攀登與懸空高處作業(yè)。雨雪天氣后,應(yīng)對(duì)高處作業(yè)設(shè)施進(jìn)行檢查,當(dāng)發(fā)現(xiàn)有松動(dòng)、變形、損壞或脫落等現(xiàn)象時(shí),應(yīng)立即修理完善,維修合格后方可使用。

When working at heights in rainy, frosty, foggy, snowy or other weather conditions, anti slip, anti freezing, and lightning protection measures should be taken, and water, ice, snow, and frost should be promptly removed from the work surface. When encountering severe weather conditions such as strong winds of level 6 or above, dense fog, and sandstorms, outdoor climbing and suspended high-altitude operations are not allowed. After rainy and snowy weather, safety facilities for high-altitude operations should be inspected. If any looseness, deformation, damage or detachment are found, they should be repaired and improved immediately. Only after passing the repair can they be used.

9 對(duì)需臨時(shí)拆除或變動(dòng)的防護(hù)設(shè)施,應(yīng)采取可靠措施,作業(yè)后應(yīng)立即恢復(fù)。

Reliable measures should be taken for safety protection facilities that need to be temporarily dismantled or changed, and they should be restored immediately after operation.

本文由工地圍擋提供幫助,更多的相關(guān)內(nèi)容請(qǐng)點(diǎn)擊http://www.btmj.net希望本文能夠?yàn)槟鷰?lái)幫助,感謝您的閱讀!

This article is provided by the construction site fence for assistance. For more related content, please click on http://www.btmj.net I hope this article can be helpful to you. Thank you for reading!

性高朝大尺度少妇大屁股| 国产CHINESEHDXXXX| 偷偷色噜狠狠狠狠的777米奇| 日本少妇高潮喷水XXXXXXX| 被老外做的下身都肿了| 中国娇小与黑人巨大交| 亚洲国产精品一区二区久久HS| 变态抽搐顶弄H| 亚洲日韩欧美一区二区三区| 三个男人躁我一个爽视频免费| 成人DVD碟片| 欧美一区二区三区爽大粗| 成免费CRM在线看系统| 国产A级理论片无码老男人| 精品亚洲AV无码区最新| AV香港经典三级级 在线| 午夜精品久久久久久久99蜜桃 | 久久久久久国产A免费观看| 变态抽搐顶弄H| 色欲蜜桃AV无码中文字幕| 欧美囗交XX×BBB视频| 一性一交一伦一片A片庆| 欧美性受xxxx88喷潮| 日本爽爽爽爽爽爽在线观看免| 亚洲成AV人片在线天堂无| 天天摸日日添狠狠添婷婷| 蜜臀AV在线播放一区二区三区| 日本SM/羞辱/调教/捆绑视频| 亚洲中文字幕无码中文字在线| 成人电影免费在线观看| 亚洲国产精品久久久久秋霞影院 | 欧美精品色婷婷五月综合| 久草视频在线观看| 婷婷久久香蕉五月综合加勒比| 极大满足求知欲的视频| 女人高潮抽搐30分钟| 欧美激性欧美激情在线| 口述他进我身体全过程| 欧美黑人又大又粗XXXXX| 成人黄金网站| 欧美熟妇搡BBBB搡BBBB|