夜月直播视频直播免费观看,娇妻玩4P被3个男人玩,人妻少妇AV中文字幕乱码,亚洲av永久无码精品

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.btmj.net/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 公司新聞

通道及施工電梯防護(hù)棚要求要求

來源:http://www.btmj.net/   發(fā)布時間:2021-11-18

1塔吊半徑以內(nèi)所有后臺制作加工、攪拌區(qū)必須搭設(shè)雙層防護(hù)棚。

1. All backstage fabrication, processing and mixing areas within the radius of tower crane must be provided with double-layer safety protection sheds.
2.操作場所掛設(shè)的標(biāo)志牌有:機械驗收合格牌、警示牌、操作規(guī)程。標(biāo)牌 的掛設(shè)高度為離地面 2.6 m標(biāo)志牌規(guī)格為寬600mm*高800mm.
2. The signboards hung at the operation site include: Qualified Mechanical acceptance board, safety warning board and operation procedures. The hanging height of the sign is 2.6 m above the ground, and the specification of the sign is 600mm wide * 800mm high
3.地面必須進(jìn)行砼硬化厚200mm,設(shè)置4L滅火器 2 只。開關(guān)箱與機械的水平 間距不得大于 3 m。
3. The ground must be hardened with concrete thickness of 200mm, and 2 4L fire extinguishers shall be set. The horizontal distance between the switch box and the machinery shall not be greater than 3 m.
4.雙層防護(hù)棚,兩層之間高度800mm,面層用噴繪布噴繪制成,正面為防護(hù) 棚名稱和標(biāo)志牌,其余三面采 用警示標(biāo)語。
4. The double-layer protective shed has a height of 800mm between the two layers. The surface layer is made of spray-painted cloth. The front side is the name of the protective shed and safety signs, and the other three sides are provided with safety warning slogans.
木工加工棚
5.加工棚名稱及標(biāo)語字高為400mm,長度根據(jù)尺寸現(xiàn)場均勻布置。
5. The name of the processing shed and the safety slogan are 400mm high, and the length is evenly arranged on site according to the size.
6.標(biāo)志牌:寬 400mm*高500mm
6. Safety signboard: 400mm wide * 500mm high
7.基礎(chǔ)施工前應(yīng)先視現(xiàn)場地質(zhì)情況做地基處理,處理方法可采用夯實、換填石 料等,必須保證其密實度
7. Before foundation construction, foundation treatment shall be carried out according to the site geological conditions. The treatment methods can be tamping, replacement of stones, etc., and its compactness must be ensured
8.立桿采用22#工字鋼立柱刷紅色油漆,每榀寬度5m,高3m。如施工現(xiàn)場場地不足,可以按5m每榀自行調(diào)整做法,但須經(jīng)現(xiàn)場技術(shù)人員同意。
8. The vertical pole adopts 22# I-steel, and the column is painted with red paint. Each frame is 5m wide and 3M high. If the construction site is insufficient, the method can be adjusted according to 5M each frame, but it must be approved by the on-site technicians.
9.圖中標(biāo)注為焊接的地方如無特殊說明的,均作滿焊處理 ,現(xiàn)場安裝前應(yīng)對各 構(gòu)件焊接質(zhì)量進(jìn)行驗收
9. The places marked as welding in the drawing shall be fully welded unless otherwise specified. The welding quality of each component shall be accepted before on-site installation
10.鋼筋加工機具應(yīng)獨立配置開關(guān)箱,開關(guān)箱中心離地面高度為1.5m. 11.軟弱基礎(chǔ)及受臺風(fēng)影響地區(qū)須增設(shè)拉錨。
10. Rebar processing machines and tools shall be equipped with switch box independently, and the height from the center of the switch box to the ground shall be 1.5m. 11. Pull anchors shall be added in weak foundation and typhoon affected areas.

吃奶呻吟打开双腿做受视频| 啊灬啊灬啊灬快灬深高潮了| 国产午夜精品一区二区三区极品| 日产一二三四乱码| 人妻丰满熟妇AV无码区免费| 精品国产乱码一区二区三区| 吃奶呻吟打开双腿做受动态图 | 中文在线ずっと好きだった| 99久无码中文字幕一本久道| 亚洲欧美色一区二区三区| 国产97在线 | 日韩| 久久久久琪琪去精品色| 精品久久久久久国产潘金莲| 亚洲精品久久无码| 最近中文字幕国语免费| 办公室撅着屁股被校长玩弄| 看看视频APP在哪里可以下载| 88蜜桃人妻无码精品系列| 国产精品自产拍高潮在线观看 | 午夜性啪啪A片免费AAA毛片| 人妻厨房出轨上司HD院线波多野| 精品国产一区二区AV片| 张开双腿客人粗暴挺进H| 一女被五六个黑人玩坏视频| 黑人巨大精品欧美一区二区一 | 老外女人毛黑P大| 色欲人妻AAAAAA无码| 久久婷婷香蕉热狠狠综合| 久久AV无码AV高潮AV不卡| 日本少妇XXX做受| 欧美激情综合色综合啪啪五月| 97精品少妇偷拍AV| 久久久久久A亚洲欧洲AV| 无码人妻黑人中文字幕| 久久AV无码专区亚洲AV桃花岛| 国产老头与老太XXXXX| 欧美亚洲国产SUV| 农村欧美丰满熟妇XXXX| 影音先锋女人AV鲁色资源网久久| 成人性生生活性生交| 99国产精品久久久久久久日本竹 |